Process chart

  • Die fabrication process chart

    process_die_img1

    process_die_img2

    Die production CAPA

    TYPE Process time
    (Hr)
    Production per day
    CAPA(SET)
    Production per month
    CAPA(SET)
    Ref.
    SAMPLE BODY1 38 14 308 + (110) additional production of 110 set is
    available with weekend shift work
    BODY2 38
    Regular production CS-COV 120 0.4 66 + (20) 13 regular models produced
    per month in average
    SS-COV 120 0.4
    Back-ups 90 0.6 additional production of
    4 models(20 set) is available with
    stamping intervals between molds
    BODY1 100 0.5
    BODY2 100 0.5
  • Jig fabrication process chart

    process_jig_img1

    process_jig_img2

    Jig production CAPA

    TYPE Production per day
    CAPA(SET)
    Production per month
    CAPA(SET)
    Ref.
    PIN JIG 50 1100 Additional production of PIN JIG 400SET,
    Figuration JIG64SET and Inspection JIG400SET
    available with weekend shift work
    Figuration JIG(AL) 8 176
    Figuration JIG(beck) 4 88
    JIG for Inspection 50 1100